fred-wilson:

the highline is opening this summer. i can’t wait.
Plant Installation: 2008 (via Friends of the High Line)

Fred Wilson (and the fact that I work @ 10th Ave btw 15th & 16th) has me pumped for the High Line.  Summer ‘09!

fred-wilson:

the highline is opening this summer. i can’t wait.

Plant Installation: 2008 (via Friends of the High Line)

Fred Wilson (and the fact that I work @ 10th Ave btw 15th & 16th) has me pumped for the High Line.  Summer ‘09!